Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
NARROW
Format
Article Type
Subject Area
Topics
Date
Availability
1-6 of 6
Keywords: planning
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Publisher: ASME
Article Type: Technical Papers
J. Offshore Mech. Arct. Eng. November 2007, 129(4): 265–272.
Published Online: May 26, 2006
... how this effect can be accounted for in inspection planning. The effect of the temporal variability in corrosion on the reliability updating following inspections is investigated. It is observed that this is of relevance only for cases with very low numbers of expected realizations of the corrosion...
Journal Articles
Publisher: ASME
Article Type: Technical Papers
J. Offshore Mech. Arct. Eng. August 2005, 127(3): 243–248.
Published Online: March 29, 2005
... concerning the correctness and consistency of uncertainty modeling applied in the most recent reliability updating analysis for structural requalification and inspection and maintenance planning. To this end an outline is given in regard to appropriate uncertainty treatment in the probabilistic modeling...
Journal Articles
Publisher: ASME
Article Type: Technical Papers
J. Offshore Mech. Arct. Eng. August 2005, 127(3): 220–226.
Published Online: March 29, 2005
...Michael Havbro Faber; John D. Sørensen; Jesper Tychsen; Daniel Straub After a brief outline of the simplified and generic approach to reliability- and risk-based inspection planning, focus is set on a recent application of the methodology for the planning of in-service NDT inspections of fixed...
Journal Articles
Publisher: ASME
Article Type: Technical Papers
J. Offshore Mech. Arct. Eng. August 2004, 126(3): 265–271.
Published Online: September 20, 2004
...Daniel Straub; Michael Havbro Faber Reliability and risk-based inspection planning (RBI) has been developed in the past for single structural details subject to fatigue, based on structural reliability analysis. This paper extends the methodology to systems with a stochastic dependency between...
Topics:
Inspection
Journal Articles
Publisher: ASME
Article Type: Technical Papers
J. Offshore Mech. Arct. Eng. August 2004, 126(3): 250–257.
Published Online: September 20, 2004
...Jan Mathisen; Kjell Larsen The use of risk-based inspection planning for offshore structural components is becoming quite familiar. This paper describes an application of this technique to mooring chain. In many cases, the technique is based on probabilistic modelling of fatigue crack growth...
Journal Articles
Publisher: ASME
Article Type: Technical Papers
J. Offshore Mech. Arct. Eng. May 2003, 125(2): 126–131.
Published Online: April 16, 2003
...Michael Havbro Faber; Daniel Straub; Jean Goyet Based on new methodological developments in the area of risk-based inspection planning (RBI) for structural components subject to fatigue degradation, the present paper presents a unified approach to risk-based inspection planning for offshore...