Operational flexibility, such as faster start-up time or faster load change rate, and higher thermal efficiency, have become more and more important for recent thermal power systems. The advanced humid air turbine (AHAT) system has been studied to improve operational flexibility and thermal efficiency of the gas turbine power generation system. Advanced humid air turbine is an original system which substitutes the water atomization cooling (WAC) system for the intercooler system of the HAT cycle. A 3 MW pilot plant, which is composed of a gas turbine, a humidification tower, a recuperator and a water recovery system, was built in 2006 to verify feasibility of the AHAT system.In this paper, ambient temperature effects, part-load characteristics and start-up characteristics of the AHAT system were studied both experimentally and analytically. Also, change in heat transfer characteristics of the recuperator of the 3 MW pilot plant was evaluated from Nov. 2006 to Feb. 2010. Ambient temperature effects and part-load characteristics of the 3 MW pilot plant were compared with heat and material balance calculation results. Then, these characteristics of the AHAT and the combined cycle (CC) systems were compared assuming they were composed of mid-sized industrial gas turbines.The measured cold start-up time of the 3 MW AHAT pilot plant was about 60 min, which was dominated by the heat capacities of the plant equipment. The gas turbine was operated a total of 34 times during this period (Nov. 2006 to Feb. 2010), but no interannual changes were observed in pressure drops, temperature effectiveness, and the overall heat transfer coefficient of the recuperator.

References

1.
The House of Councilors, National Diet of Japan
, 2010, “
Basic Act on Global Warming Countermeasures
,” http://www.sangiin.go.jp/japanese/joho1/kousei/gian/174/meisai/m17403174052.htm (in Japanese).
2.
The Ministry of Economy, Trade and Industry of Japan
, 2010, “
Basic Policy for Energy Demand and Supply
,” http://www.meti.go.jp/committee/summary/0004657/energy.pdf (in Japanese).
3.
Hatamiya
,
S.
, 2002, “
Gas Turbine Power Generation Technology Utilizing High Humidity Air
,”
The Thermal and Nuclear Power
,
53
(
9
), pp.
1031
1038
(in Japanese).
4.
Takahashi
,
T.
,
Koda
,
E.
, and
Mimaki
,
T.
, 2002, “
A Systematic Analysis of the Effect of Air Humidification to Gas Turbine Systems
,”
JSME Int. J. Ser. B
,
45
(
3
), pp.
530
535
.
5.
Higuchi
,
S.
,
Hatamiya
,
S.
,
Seiki
,
N.
, and
Marushima
,
S.
, 2003, “
A Study of Performance on Advanced Humid Air Turbine Systems
,”
IGTC 2003
, Tokyo, TS-090.
6.
Hatamiya
,
S.
,
Araki
,
H.
, and
Higuchi
,
S.
, 2004, “
An Evaluation of Advanced Humid Air Turbine System with Water Recovery
,” ASME Paper No. GT2004-54031.
7.
Araki
,
H.
,
Higuchi
,
S.
,
Marushima
,
S.
, and
Hatamiya
,
S.
, 2005, “
Design Study of a Humidification Tower for the Advanced Humid Air Turbine System
,” ASME Paper No. 2005-GT-68671.
8.
Kuroki
,
H.
,
Shibata
,
T.
,
Koganezawa
,
T.
,
Kizuka
,
N.
,
Hatamiya
,
S.
, and
Marushima
,
S.
, 2006, “
Development of Elemental Technologies for Advanced Humid Air Turbine System
,” ASME Paper No. GT2006-90639.
9.
Koganezawa
,
T.
,
Miura
,
K.
,
Saito
,
T.
,
Abe
,
K.
, and
Inoue
,
H.
, 2007, “
Full Scale Testing of a Cluster Nozzle Burner for the Advanced Humid Air Turbine
,” ASME Paper No. GT2007-27737.
10.
Takahashi
,
T.
,
Nakao
,
Y.
, and
Koda
,
E.
, 2007, “
Analysis and Evaluation about Advanced Humid Air Turbine System
,”
ICOPE 2007
, Hangzhou, China,
E060
.
11.
Araki
,
H.
,
Katagiri
,
Y.
,
Marushima
,
S.
,
Hatamiya
,
S.
,
Higuchi
,
S.
, and
Tsukamoto
,
M.
, 2007, “
Experimental Results of Humidification and Water Recovery of the Advanced Humid Air Turbine System Pilot Plant
,”
IGTC 2007
, Tokyo,
TS
-
012
.
12.
Katagiri
,
Y.
,
Araki
,
H.
,
Koganezawa
,
T.
,
Hatamiya
,
S.
, and
Marushima
,
S.
, “
Humidity and Plant Control System for the Advanced Humidified Air Turbine Pilot Plant
,”
IGTC 2007
, Tokyo,
TS
-
013
.
13.
Higuchi
,
S.
,
Koganezawa
,
T.
,
Horiuchi
,
Y.
,
Araki
,
H.
,
Shibata
,
T.
, and
Marushima
,
S.
, 2008, “
Test Results from the Advanced Humid Air Turbine System Pilot Plant – Part 1: Overall Performance
,” ASME Paper No. GT2008-51072.
14.
Araki
,
H.
,
Higuchi
,
S.
,
Koganezawa
,
T.
,
Marushima
,
S.
,
Hatamiya
,
S.
, and
Tsukamoto
,
M.
, 2008, “
Test Results from the Advanced Humid Air Turbine System Pilot Plant – Part 2: Humidification, Water Recovery and Water Quality
,” ASME Paper No. GT2008-51089.
15.
Araki
,
H.
Koganezawa
,
T.
Myouren
,
C.
Higuchi
,
S.
Takahashi
,
T.
, and
Eta
,
T.
, 2010, “
Operation Characteristics of the AHAT system
,” Proceedings of the 38th GTSJ Annual Meeting, Tokushima, Japan,
C4
(in Japanese).
16.
Nakamura
,
H.
, and
Yamamoto
,
K.
, 1992, “
HAT (Humid Air Turbine) Cycle
,”
The Thermal and Nuclear Power
,
43
(
12
), pp.
1587
1592
(in Japanese).
17.
Mori
,
Y.
,
Nakamura
,
H.
,
Takahashi
,
T.
, and
Yamamoto
,
K.
, 1983, “
A Highly Efficient Regenerative Gas Turbine System by New Method of Heat Recovery with Water Injection
,”
IGTC 1983
, Tokyo, pp.
297
303
.
18.
Rao
,
A. D.
,
Francuz
,
V. J.
,
Shen
,
J. C.
, and
West
,
E. W.
, 1991, “
A Comparison of Humid Air Turbine (HAT) Cycle and Combined-Cycle Power Plants
,” EPRI IE-7300 Project 2999-7 Final Report.
19.
Lindquist
,
T. O.
,
Rosén
,
P.
, and
Torisson
,
T.
, 2000, “
Theoretical and Experimental Evaluation of the EvGT-Process
,”
ASME AES
,
40
, pp.
457
469
.
20.
Lindquist
,
T. O.
,
Rosén
,
P.
, and
Torisson
,
T.
, 2000, “
Evaporative Gas Turbine Cycle—A Description of a Pilot Plant and Operating Experience
,”
ASME AES
,
40
, pp.
511
520
.
21.
Lindquist
,
T. O.
,
Thern
,
M.
, and
Torisson
,
T.
, 2002, “
Experimental and Theoretical Results of a Humidification Tower in an Evaporative Gas Turbine Cycle Pilot Plant
,” ASME Paper No. GT-2002-30127.
22.
Ågren
,
N. D.
,
Westermark
,
M. O.
,
Bartlett
,
M. A.
, and
Lindquist
,
T. O.
, 2000, “
First Experiments on an Evaporative Gas Turbine Pilot Power Plant: Water Circuit Chemistry and Humidification Evaluation
,” ASME Paper No. 2000-GT-0168.
23.
Lorenz
,
M.
, 2004, “
Modeling and Off Design Simulation of the Evaporative Gas Turbine
,”
Studienarbeit, Department of Heat and Power Engineering, Lund Institute of Technology, Lund University
,
Lund, Sweden
.
24.
Wang
,
B.
,
Zhang
,
S.
, and
Xiao
,
Y.
, 2007, “
Steady-State Off-Design Performance of Humid Air Turbine Cycle
,” ASME Paper No. GT2007-27350.
25.
Akiyoshi
,
R.
,
Imai
,
K.
,
Sioda
,
T.
,
Ito
,
K.
, and
Hori
,
M.
, 2003, “
Development of Large Scale Recuperator for Gas Turbine
,”
IGTC 2003
, Tokyo,
TS
-
112
.
26.
Thermoflow, Inc.
, “
GT PRO
,” http://www.thermoflow.com/CombinedCycle_GTP.htm
27.
Nishiyama
,
Y.
,
Otsuka
,
N.
,
Kitamura
,
K.
, and
Abe
,
M.
, 2010, “
Development of Heat Resistant Stainless Steel Sheet ⟨NAR-AH-7⟩ for Advanced High-Temperature Recuperators
,”
J. Min. Mater. Process. Inst. Jpn.
,
49
(
2
), pp.
72
74
(in Japanese).
28.
Wieting
,
A. R.
, 1975, “
Empirical Correlations for Heat Transfer and Flow Friction Characteristics of Rectangular Offset-Fin Plate-Fin Heat Exchangers
,”
ASME J. Heat Transfer
,
97
(
3
), pp.
488
490
.
You do not currently have access to this content.