The last decade has seen remarkable improvements in industrial gas turbine size and performances. There is no doubt that the coming years are holding the promise of even more progress in these fields. As a consequence, the fuel utilization achieved by combined cycle power plants has been steadily increased. This is, however, also because of the developments in the heat recovery technology. Advances on the gas turbine side justify the development of new combined cycle schemes, with more advanced heat recovery capabilities. Hence, the system performance is spiraling upward. In this paper, we look at some of the heat recovery possibilities with the newly available gas turbine engines, characterized by a high exhaust temperature, a high specific work, and the integration of some gas turbine cooling with the boiler. The schemes range from classical dual pressure systems, to triple pressure systems with reheat in supercritical steam conditions. For each system, an optimum set of variables (steam pressures, etc.) is proposed. The effect of some changes on the steam cycle parameters, like increasing the steam temperatures above 570°C are also considered. Emphasis is also put on the influence of some special features or arrangements of the heat recovery steam generators, not only from a thermodynamic point of view.

1.
Bolland
O.
,
1991
, “
A Comparative Evaluation of Advanced Combined Cycle Alternatives
,”
ASME JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER
, Vol.
113
, pp.
190
197
.
2.
Borglin, S., 1991, “A Contribution to the Thermodynamic Calculation of Open Gas Turbine Processes,” ASME IGTI-Vol 6,
3.
Brandt, D. E., 1992, “The Application of a Mature Gas Turbine Design Philosophy,” ASME IGTI-Vol 7.
4.
Dechamps, P. J., 1991, “Users Guide for the GTCALC, CCCALC and CASHFLOW Programs,” internal lecture notes, University of Liege, Mar.
5.
Dechamps, P. J., and Mathieu, Ph., 1991, “IGCC Plants as Alternatives to Pulverized Coal Plants in Western Countries,” presented at the First International Conference on Combustion Technologies for a Clean Environment, Portugal.
6.
Dechamps, P. J., and Mathieu, Ph., 1992a, “Modelling of a Steam Power Plant Repowering Option: Replacement of the Conventional Boiler With a New HRSG,” ASME IGTI-Vol 7.
7.
Dechamps, P. J., and Mathieu, Ph., 1992b, “Phasing the Construction of an IGCC Plant for Fuel Flexibility,” ASME Paper No. 92-GT-144.
8.
Dechamps, P. J., Magain, D., and Mathieu, Ph., 1993, “Advanced Combined Cycle Alternatives With Advanced Gas Turbines,” ASME IGTI-Vol. 8.
9.
Jericha, H., Ho¨ller, F., and Kindlhofer, H., 1991, “Modular Combined Cycle Plant Enhanced for More Efficiency, Power and Maintainability,” ASME IGTI-Vol. 6.
10.
Jury, W., and Luthi, H. K., 1994, “Advanced GT’s Call for Advanced CC’s,” ASME Paper No. 94-GT-303.
11.
Luthi, H. K., 1994, “The ABB GT24/26 Gas Turbine Family With Sequential Combustion,” Proc. PowerGen Europe Conference, Vol. 9, May 1994, Koln, Germany.
12.
Stecco, S., Bidini, G., and Grimaldi, C., 1991, “Thermodynamic Insight in Designing or Selecting Recovery Boilers for Gas-Steam Combined Power Plants,” ASME IGTI-Vol 6.
13.
Van der Linden, S., 1995, “ABB’s GT-24 Gas Turbine at GPU’s Gilbert Station,” Proc. 1995 EPRI Conference on New Power Generation Technology, San Francisco, CA.
This content is only available via PDF.
You do not currently have access to this content.