Loop-seal is a critical component of a circulating fluidized bed (CFB) boiler, and yet very little information on its working or design is available in published literature. Among the limited available information, none is on twin-exit loop-seal though it is one of the most commonly used loop-seal in large commercial CFB boilers. To circulate larger amounts of solids, a twin-exit loop-seal provides larger solids flow sections. It receives solids from one standpipe but delivers it through two recycle chambers and two delivery pipes. The present research was conducted in a twin-exit loop-seal of a CFB boiler operating in a thermal power plant for cofiring purpose. Data obtained in this industrial unit were supplemented with those collected in a single-exit bench-scale loop-seal in the authors’ laboratory from the single-exit loop-seal in a 65 t/h CFB boiler and a scale model of a 30 MW CFB boiler. The effect of recycle chamber’s aeration on the solids circulation rate was studied for several particle sizes. Results suggest that the total solids circulation rate does not increase proportionately with the increase in loop-seal discharge area provided by the twin-exit loop-seals. The linear horizontal velocities of solids and the minimum aeration in the recycle chambers are comparable to those measured in a single-exit loop-seal. The implication of these new findings on the design procedure of loop-seals is discussed.
Skip Nav Destination
Article navigation
December 2009
Research Papers
An Investigation Into the Operation of the Twin-Exit Loop-Seal of a Circulating Fluidized Bed Boiler in a Thermal Power Plant and Its Design Implication
Prabir Basu,
Prabir Basu
Department of Mechanical Engineering,
Dalhousie University
, P. O. Box 1000, Halifax, Canada B3J 2X4
Search for other works by this author on:
Munish Chandel,
Munish Chandel
Department of Mechanical Engineering,
Dalhousie University
, P. O. Box 1000, Halifax, Canada B3J 2X4
Search for other works by this author on:
James Butler,
James Butler
Greenfield Research Incorporated
, P. O. Box 25018, Halifax, Canada B3M 4H4
Search for other works by this author on:
Animesh Dutta
Animesh Dutta
Greenfield Research Incorporated
, P. O. Box 25018, Halifax, Canada B3M 4H4
Search for other works by this author on:
Prabir Basu
Department of Mechanical Engineering,
Dalhousie University
, P. O. Box 1000, Halifax, Canada B3J 2X4
Munish Chandel
Department of Mechanical Engineering,
Dalhousie University
, P. O. Box 1000, Halifax, Canada B3J 2X4
James Butler
Greenfield Research Incorporated
, P. O. Box 25018, Halifax, Canada B3M 4H4
Animesh Dutta
Greenfield Research Incorporated
, P. O. Box 25018, Halifax, Canada B3M 4H4J. Energy Resour. Technol. Dec 2009, 131(4): 041401 (8 pages)
Published Online: October 12, 2009
Article history
Received:
August 21, 2008
Revised:
July 7, 2009
Published:
October 12, 2009
Citation
Basu, P., Chandel, M., Butler, J., and Dutta, A. (October 12, 2009). "An Investigation Into the Operation of the Twin-Exit Loop-Seal of a Circulating Fluidized Bed Boiler in a Thermal Power Plant and Its Design Implication." ASME. J. Energy Resour. Technol. December 2009; 131(4): 041401. https://doi.org/10.1115/1.4000174
Download citation file:
Get Email Alerts
Related Articles
A Method for Reduction in the Start-Up Time of a Bubbling Bed Boiler Combustor
J. Energy Resour. Technol (September,2010)
The Performance of a Loop Seal in a CFB Boiler
J. Energy Resour. Technol (June,2006)
On the Computational Modeling of Unfluidized and Fluidized Bed Dynamics
J. Fluids Eng (October,2014)
Flow Regime Study of a Light Material in an Industrial Scale Cold Flow Circulating Fluidized Bed
J. Energy Resour. Technol (June,2006)
Related Proceedings Papers
Related Chapters
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Front Matter
Companion Guide to the ASME Boiler & Pressure Vessel Codes, Volume 1 Sixth Edition
Front Matter
Companion Guide to the ASME Boiler & Pressure Vessel Codes, Volume 2, Sixth Edition