The offshore pilot test of Exxon’s Submerged Production System (SPS) has reached a successful conclusion. This pilot test encompassed the entire spectrum of SPS equipment, spanning from the well completion intervals to, but not including, common surface processing and storage facilities. Since the SPS is designed to meet all the life cycle needs of a subsea field, one of the objectives of the pilot test was to evaluate both the techniques and the equipment used to install, operate, and maintain a prototype version of the SPS. The equipment under test was designed for use in water depths up to 2000 ft, but with minor modifications it is capable of operating in significantly greater depths. Evaluation of pilot test results has shown that the deep water installation techniques are practicable and that the deep water maintenance machinery is competent to repair any failures likely to occur in an operating system. One of the most significant problems in conducting the pilot test was achieving adequate quality control during equipment manufacture. The test results have demonstrated that, with relatively minor modifications, the SPS is suitable for commercial application.
Skip Nav Destination
Article navigation
March 1980
Research Papers
Submerged Production System—A Final Report
J. A. Burkhardt,
J. A. Burkhardt
Exxon Co., New Orleans, La. 70160
Search for other works by this author on:
T. W. Childers,
T. W. Childers
Exxon Co., New Orleans, La. 70160
Search for other works by this author on:
R. E. Anderson,
R. E. Anderson
Exxon Co., New Orleans, La. 70160
Search for other works by this author on:
T. W. Michie
T. W. Michie
Exxon Co., New Orleans, La. 70160
Search for other works by this author on:
J. A. Burkhardt
Exxon Co., New Orleans, La. 70160
T. W. Childers
Exxon Co., New Orleans, La. 70160
R. E. Anderson
Exxon Co., New Orleans, La. 70160
W. D. Loth
Exxon Co., New Orleans, La. 70160
T. W. Michie
Exxon Co., New Orleans, La. 70160
J. Energy Resour. Technol. Mar 1980, 102(1): 30-34 (5 pages)
Published Online: March 1, 1980
Article history
Received:
October 10, 1979
Online:
October 22, 2009
Citation
Burkhardt, J. A., Childers, T. W., Anderson, R. E., Loth, W. D., and Michie, T. W. (March 1, 1980). "Submerged Production System—A Final Report." ASME. J. Energy Resour. Technol. March 1980; 102(1): 30–34. https://doi.org/10.1115/1.3227846
Download citation file:
11
Views
Get Email Alerts
Cited By
Related Articles
Design, Fabrication, and Installation of a Prototype Multiline Marine Production Riser System
J. Pressure Vessel Technol (February,1977)
Opportunity Window for Energy Saving and Maintenance in Stochastic Production Systems
J. Manuf. Sci. Eng (December,2016)
Supervisory Factory Control Based on Real-Time Production Feedback
J. Manuf. Sci. Eng (June,2007)
FDPSOs: The new reality, and a game-changing approach to field development and early production systems
Mechanical Engineering (May,2011)
Related Proceedings Papers
Related Chapters
Subsection NCA—General Requirements for Division 1 and Division 2
Companion Guide to the ASME Boiler & Pressure Vessel Code, Volume 1, Second Edition
Subsection NCA—General Requirements for Division 1 and Division 2
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 1, Third Edition
Decision Making in Two-Dimensional Warranty Planning (PSAM-0186)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)